Difference between revisions of "Structure Validity"
Jump to navigation
Jump to search
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
[[Category:Concepts_Reference_V10]] | [[Category:Concepts_Reference_V10]] | ||
[[Category:Concepts_Reference_V11]] | [[Category:Concepts_Reference_V11]] | ||
− | A | + | A Maintainable structure can be given an optional '''validity period''' expressed as start and end dates between which it is considered valid. |
− | Validity periods are generally used where a structure or a version of a structure needs to have a very clearly defined lifespan, perhaps when replacing one version of a | + | Validity periods are generally used where a structure or a version of a structure needs to have a very clearly defined lifespan, perhaps when replacing one version of a Data Structure Definition with a another. |
Latest revision as of 03:50, 5 September 2022
A Maintainable structure can be given an optional validity period expressed as start and end dates between which it is considered valid.
Validity periods are generally used where a structure or a version of a structure needs to have a very clearly defined lifespan, perhaps when replacing one version of a Data Structure Definition with a another.